University of Vermont South Campus Master Plan
Client: University of Vermont
- Conducted both peak-period turning counts at 10 locations and an origin-destination survey
- Determined the distribution of trips generated by a proposed on-campus development under various routing alternatives
- Analyzed impacts of the various routing alternatives on the progression of Main Street traffic using microsimulation, queuing analysis, and conventional level-of-service procedures
- Designed signal timing plans and recommended measures for mitigating off-site traffic impacts